RadWaste Vol. 7 No. 40
Visit Archives | Return to Issue
PDF
RadWaste Monitor
Article 3 of 8
October 24, 2014

New Estimate Puts Vermont Yankee Decommissioning at $1.24 Billion

By Jeremy Dillon
Jeremy L. Dillon RW Monitor 10/24/2014 The Vermont Yankee decommissioning project will cost an estimated $1.24 billion, up from previous estimates of approximately $1 billion, according to Entergy’s latest site assessment study released late last week.…
Thank you for visiting
RadWaste Monitor!

You must be logged in as a subscriber to view this page.

Not a subscriber? Click here to sign up for a FREE six-week trial and receive access to this article, along with our entire archives.

LOGIN

Please contact [email protected] if you are unable to login.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More