Publications: Weapons Cleanup Monitor
-
Vitrification & Grout
Wash. State OKs Grouting to Stabilize Second Hanford Waste Tunnel
Workers at the Hanford Site are preparing to start filling the PUREX Plant’s second waste storage tunnel with concrete-like grout as soon as this week, after the Washington state Department of Ecology on Sept. 28 approved the interim stabilization work to prevent collapse. In May 2017, there was a partial collapse of the older and […]
-
Innovation & Infrastructure
Bulk of SRS Road Infrastructure Project Slated for 2020 Completion
A $40 million project to refurbish all 119 miles of paved roads at the Savannah River Site in South Carolina is on pace for completion by fiscal 2023, with work on the last of three major roads expected to wrap up by 2020. In an update on the project last week, Thomas Johnson, the Department […]
-
High-Level & Tank Waste
Hanford Tank Farm Manager Gets Contract Extension
Washington River Protection Solutions has been awarded a contract extension of up to a year for management of the radioactive waste storage tanks at the Hanford Site in Washington state. The Department of Energy announced the extension Sept. 28, two days before the expiration of WRPS’ 10-year contract. The contract extension, which will expire Sept. […]
-
Cleanup & Remediation
DOE Focuses on 70-Acre Central Bear Creek Site for Oak Ridge Landfill
The Energy Department believes the central Bear Creek Valley is the best place within the Oak Ridge Reservation (ORR) in Tennessee to develop a new 2.2-million-cubic yard waste disposal facility – due in part to its geology and groundwater flow conditions. Because the same valley is home to Oak Ridge’s existing Environmental Management Waste Management […]
-
Contracts & Procurement
Several Big DOE Cleanup Contracts Could be Awarded by New Year
The Energy Department’s Office of Environmental Management expects to award a trio of big contracts, two of them re-awards following protests by losing bidders, by the end of the year. The department hopes this month to reissue both the liquid waste management contract at the Savannah River Site in South Carolina and a consolidated technical […]
-
Decommissioning
Centrus Nabs $15 Million Deal to Decommission Oak Ridge Facility
The Energy Department has retained Centrus Energy to prepare the K-1600 facility at the Oak Ridge Reservation in Tennessee for demolition. The Rockville, Md.-based nuclear fuel supplier has leased the uranium enrichment plant since 2002. Centrus announced Tuesday it has received a $15 million work authorization for decontamination and decommissioning (D&D) of the plant, one […]
-
Transuranic Waste
Wrap Up: Livermore to Resume TRU Shipments to WIPP
Another Department of Energy facility is preparing to resume shipping its transuranic waste to the Waste Isolation Pilot Plant (WIPP) in New Mexico. Shipments of contact-handled waste from the Lawrence Livermore National Laboratory in California should begin in 2019, lab spokesman Nolan O’Brien said Tuesday by email. The resumption is based on availability of funding […]
-
Vitrification & Grout
Veolia, Battelle Ink Deal for Vitrification Technology Testing
A newly inked deal has paved the way for Veolia Nuclear Solutions to demonstrate its patented GeoMelt technology to process radioactive waste sent from the Idaho National Laboratory (INL). Under the agreement, announced Sept. 25, INL management and operations contractor Battelle Energy Alliance (BEA) will ship some drums with small amounts of radioactive contaminated sodium […]
-
- Trump Signature Gives DOE Cleanup Office Fattest Budget in Years
- Draft RFP Issued for Hanford Plateau Cleanup, DOE Extends Current Contract
- Fluor-BWXT Lands Final 30-Month Contract Extension at Portsmouth Site
- DOE Rejects Request to Send Treated Waste From Savannah River to WIPP
- WIPP to Receive Remote-Handled TRU From Argonne
- Parsons Could Be Dinged on Fee for Delay in SRS Salt Waste Plant
- Trump to Remove ‘Acting’ From Hamilton’s DNFSB Title
- House Passes West Valley Reauthorization Measure
- Bechtel Picks New Treatment Plant Chief at Hanford
- Hearing Scheduled in SRR Discrimination Suit
- Wrap Up: DOE Veteran Owendoff Takes New Job
-
Transuranic Waste
House Passes West Valley Reauthorization Measure
The House of Representatives passed in a voice vote Monday a bill to reauthorize the West Valley Demonstration Project in New York state, legislation approved by the House Energy and Commerce Committee in July. The amended version of the bill would hike the site’s funding to $75 million annually starting immediately through fiscal 2028 and […]
-
Decommissioning
Fluor-BWXT Lands Final 30-Month Contract Extension at Portsmouth Site
Fluor-BWXT Portsmouth has picked up its second and last option period as cleanup contractor at the Department of Energy’s Portsmouth Site in Ohio. The Energy Department announced the contract extension, valued at about $850 million, on Thursday afternoon, three days before the current 30-month extension was set to expire. The company began work on its […]
-
Cleanup & Remediation
Hearing Scheduled in SRR Discrimination Suit
A federal judge has scheduled a hearing for Oct. 17 to addressing scheduling and other matters in a former employee’s discrimination lawsuit against the liquid waste manager at the Department of Energy’s Savannah River Site in South Carolina. The hope is to expedite progress in the case filed more than two years ago, according to […]
-
Transuranic Waste
DOE Rejects Request to Send Treated Waste From Savannah River to WIPP
The Department of Energy has denied a local advisory group’s request to make treated liquid waste at the Savannah River Site in South Carolina eligible for disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The request, submitted in July by the SRS Citizens Advisory Board (CAB), asked the Energy Department to recharacterize […]
-
High-Level & Tank Waste
Bechtel Picks New Treatment Plant Chief at Hanford
Bechtel National is bringing on a new project director for the Waste Treatment Plant at the Department of Energy’s Hanford Site in Washington state, employees were told on Sept. 21. Brian Reilly, who joined the project last December, will be replaced by Valerie McCain. Reilly has been reassigned to the position of project director for […]
-
Budget & Policy
Trump Signature Gives DOE Cleanup Office Fattest Budget in Years
When President Donald Trump signed a multiagency appropriations package Sept. 21, it assured the Energy Department’s Office of Environmental Management about $7.2 billion in funding for the 2019 fiscal year starting Oct. 1. The DOE-funding “minibus,” approved by Congress earlier this month, provides the largest budget for the department’s nuclear cleanup office since it received […]
-
Budget & Policy
Trump to Remove ‘Acting’ From Hamilton’s DNFSB Title
President Donald Trump plans to appoint Defense Nuclear Facilities Safety Board (DNFSB) acting Chairman Bruce Hamilton to the top position on a permanent basis, the White House said this week. Hamilton, a Navy veteran who spent decades in the nuclear energy industry, joined the board in August 2015 and was elevated to vice chairman in […]
-
Contracts & Procurement
Draft RFP Issued for Hanford Plateau Cleanup, DOE Extends Current Contract
The Department of Energy on Thursday released a draft request for proposals for the Hanford Site Central Plateau Cleanup Contract that takes a new approach to the scope of work at the cleanup job in Washington state. The agency is asking bidders to indicate what environmental cleanup activities they could complete given 10 years, including […]
-
Transuranic Waste
Wrap Up: DOE Veteran Owendoff Takes New Job
Less than two months after stepping aside as the No. 2 official in the Energy Department’s nuclear cleanup office, James Owendoff is taking a new job within the agency. Starting next week, Owendoff will be DOE-wide chief risk officer, a senior executive position within the office of the Chief Financial Officer John Vonglis. He formally […]
-
High-Level & Tank Waste
Parsons Could Be Dinged on Fee for Delay in SRS Salt Waste Plant
Parsons could end up sacrificing a significant amount of its fee for delays in startup of the Salt Waste Processing Facility (SWPF) at the Energy Department’s Savannah River Site in South Carolina, a DOE official said Monday. Parsons was expected this week to submit a new cost and schedule update for the facility, SWPF Federal […]
-
Transuranic Waste
WIPP to Receive Remote-Handled TRU From Argonne
The Energy Department’s Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M., expects to start receiving remote-handled transuranic waste from the Argonne National Laboratory in Illinois by the end of this year, DOE Carlsbad Field Office Manager Todd Shrader said recently. “We are about to add a new site, Argonne, this fall,” Shrader said Sept. 12 […]
-
- Settlement Reached in Hanford Vapor Lawsuit
- Next Hanford Services Contract Goes to Bid
- WCS Asks NRC Permission to Keep Problem Waste in Texas Through 2020
- DNFSB Claims DOE Order Ignores Board’s Legal Authority
- Energy Department Tardy on Waste Report Required by 2018 NDAA
- Idaho Falls Mayor Fears Potential Layoffs at DOE Waste Project
- New Mexico Hears Support, Opposition for Change in WIPP’s Waste Counting
- DOE Contractor Prepared to Resume Salt Mining at WIPP
- Savannah River Contractor Asks Judge to Dismiss Discrimination Case
- Final DOE Violation Notice Issued for Hanford Treatment Plant Injury
- SRS Avoids Hurricane Florence With No Impacts to Facilities
- Wrap Up: Paducah Site Briefly Lost Power Saturday
- Correction
-
Cleanup & Remediation
Savannah River Contractor Asks Judge to Dismiss Discrimination Case
The liquid waste contractor for the Department of Energy’s Savannah River Site in South Carolina is asking a federal judge to dismiss a discrimination lawsuit filed by a former employee. In a Sept. 14 motion for summary judgment, Savannah River Remediation (SRR) said Adrienne Saulsberry was terminated for legitimate reasons. The contractor said its fact […]
-
Transuranic Waste
DOE Contractor Prepared to Resume Salt Mining at WIPP
After a pause this summer, the contractor for the Energy Department’s Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M., expects during the first week of October to resume salt mining to dig out more disposal space. This will be the first mining in storage Panel 8 since July 22, according to Nuclear Waste Partnership spokesman […]
-
Cleanup & Remediation
SRS Avoids Hurricane Florence With No Impacts to Facilities
Despite threats of severe weather that required the Savannah River Site to brace for impact, the facility emerged unscathed after Hurricane Florence slammed into South Carolina last week. The storm, which has been linked to dozens of deaths in several coastal states, had no impact on missions or facilities at the 310-square-mile Department of Energy […]
-
Cleanup & Remediation
Settlement Reached in Hanford Vapor Lawsuit
The Department of Energy and several other parties on Wednesday signed a settlement agree to a 3-year-old federal lawsuit seeking better protection from chemical vapors for workers at the Hanford Site in Washington state. The agreement, if approved by the court, would freeze the case as Hanford tank farm contractor Washington River Protection Solutions (WRPS) […]
-
Transuranic Waste
WCS Asks NRC Permission to Keep Problem Waste in Texas Through 2020
Waste Control Specialists (WCS) has asked the Nuclear Regulatory Commission for permission to keep stranded transuranic waste from the Los Alamos National Laboratory (LANL) in New Mexico for an additional two years. The Dallas-based company asked the agency for an extension until Dec. 23, 2020, to allow the state of Texas, the Department of Energy, […]
-
Cleanup & Remediation
Correction
An article in the Sept. 14 Weapons Complex Monitor mischaracterized the nature of the Government Accountability Office’s ruling upholding a contract protest against a liquid waste management contract award at the Department of Energy’s Savannah River Site in South Carolina. The GAO ruled the Energy Department failed to evaluate the viability of the winning bidder’s […]
-
Transuranic Waste
Energy Department Tardy on Waste Report Required by 2018 NDAA
The Energy Department apparently still hasn’t submitted a report to Congress due Feb. 1 on classifying certain defense nuclear waste. The National Defense Authorization Act (NDAA) for fiscal 2018, signed last December, said the “Secretary of Energy shall conduct an evaluation of the feasibility, costs, and cost savings of classifying covered defense nuclear waste as […]
-
Contracts & Procurement
Next Hanford Services Contract Goes to Bid
The Department of Energy on Thursday released the request for proposals for the Hanford Mission Essentials Services Contract. The award has a projected value of $4 billion to $6 billion over 10 years, including option periods. The work is now performed at the Hanford Site in Washington state by Mission Support Alliance, owned by Leidos […]
-
Transuranic Waste
Idaho Falls Mayor Fears Potential Layoffs at DOE Waste Project
Layoffs are expected within a couple months at Fluor Idaho’s Advanced Mixed Waste Treatment Project (AMWTP), Idaho Falls Mayor Rebecca Casper said last week. The facility workforce at the Department of Energy’s Idaho National Laboratory “is on its way out the door,” Casper said. This is expected “before the New Year, before the holidays,” she […]







