Morning Briefing - September 02, 2020
Visit Archives | Return to Issue
PDF
Morning Briefing
Article 1 of 6
September 02, 2020

NNSA Officially Approves Los Alamos to Make ICBM Pits Starting in 2026

By ExchangeMonitor

The National Nuclear Security Administration (NNSA) on Wednesday morning officially green-lit the Los Alamos National Laboratory to make 30 war-ready warhead cores in 2026 for next-generation intercontinental ballistic missiles.

Under the long-expected decision, the northern New Mexico weapon-design laboratory “will produce a minimum of 30 war reserve pits per year for the national pit production mission during 2026 and implement surge efforts to exceed 30 pits per year as needed,” the semiautonomous Departmnt of Energy agency stated in a Federal Register notice.

The agency published the decision right after releasing its environmental review of the planned pit plant: an expansion of the lab’s Plutonium Facility (PF-4), which has already cast a few practice pits, and which handles other plutonium missions for the NNSA. The agency says the planned Los Alamos pit facility could increase its output to more 80 pits annually, if needed. 

That is enough, even without the addition of a planned NNSA pit plant at the Savannah River Site in Aiken, S.C., to meet military requirements for pit production from 2030 onward. All the new plutonium cores produced at Los Alamos and Savannah River will initially be for W87-1 warheads intended for the Ground-Based Strategic Deterrent missiles expected to the Minuteman III fleet starting around 2030. An NNSA environmental review for the Savannah River facility is ongoing.

Disarmament activists have complained that the NNSA’s just-completed environmental review, a pit-focused supplemental analysis to a much broader 2008 environmental impact statement that covered all of Los Alamos, failed to consider the pit mission’s affects on the rest of the site, the state of New Mexico, and the entire DOE nuclear complex.

New Mexico itself, while not going so far as to call for an entirely new site-wide environmental impact statement, had its own concerns about the recent review’s narrow focus — concerns that did not stop the NNSA from officially approving the Los Alamos pit mission on Wednesday.

In public comments published in July, Santa Fe complained that Los Alamos’ new pit mission might illegally strand some Cold War-era transuranic waste at the lab

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More