Archive

Bechtel

A major engineering and construction contractor with long-standing roles across the weapons complex, including waste treatment plant construction and national laboratory management.

  • Pantex Back to Normal Ops; All Personnel Return as Texas Thaws

    The National Nuclear Security Administration’s nuclear weapons assembly hub in Texas was scheduled for more or less back to normal operations on Monday after asking non-essential personnel to remain home for most of last week during Texas’ disastrous deep freeze. “Pantex operations are back to normal schedule today,” a spokesperson for the Bechtel National-led plant […]

  • Wrap Up: GOP Figure Shultz Served as Bechtel President

    In addition to serving in key leadership posts for Republican presidents from Dwight Eisenhower to Ronald Reagan, George Shultz, who died over the weekend at age 100, was also a top Bechtel executive in the 1970s and 1980s. Shultz first joined Bechtel in 1974 as executive vice president and “already had more experience and accomplishments […]

  • Former GOP Cabinet Icon Shultz Served as Bechtel President

    In addition to serving in key leadership posts for Republican presidents from Dwight Eisenhower to Ronald Reagan, George Shultz, who died over the weekend at age 100, was also a top Bechtel executive in the 1970s and 1980s. Shultz first joined Bechtel in 1974 as executive vice president and “already had more experience and accomplishments […]

  • Washington State Takes Comments on Key Hanford Permit

    The Washington state Department of Ecology kicked off a 45-day comment period Monday on proposed changes to its permit for the Waste Treatment Plant being built by Bechtel at the Department of Energy’s Hanford Site. The state is inviting public comment until March 17 on the closure plan for the $17-billion facility designed to convert […]

  • Planning Starts for DOE’s New Hanford Tank Waste Contract

    Less than a month after officially calling off a $13-billion liquid-waste cleanup award at the Hanford Site, the Department of Energy has started procurement of a replacement pact called the Hanford Integrated Tank Disposition Contract, with a draft solicitation expected by March. The draft request for proposals (RFP) will, unlike the now-revoked tank-waste contract awarded […]

  • Capitol Siege Leads Some DOE Contractors to Rethink Political Contributions

    In the wake of the Jan. 6 riot and takeover of the U.S. Capitol Building, and the public rancor which preceded it, several companies doing business in the Department of Energy weapons complex are reconsidering their approach to political donations. For example, Leidos Chairman and CEO Roger Krone announced Tuesday his company’s political action committee […]

  • SRR Wins 98% of Available Fee at Savannah River; Hanford Firms Do Well

    Amentum-led Savannah River Remediation, the liquid waste contractor at the Department of Energy’s Savannah River Site in South Carolina, took home almost $64 million or 98% of its total potential fee for work done over an 18-month period ending Sept. 30, 2020. The contractor was rated “very good” on its subjective fee as determined by […]

  • DOE Completes Construction of Low-activity Waste Facilities at Hanford Plant

    The Department of Energy and Bechtel announced Wednesday in an online ceremony that construction of facilities needed to start processing low-activity tank waste are complete at the $17-billion vitrification plant at the Hanford Site in Washington state. The direct-feed low-activity waste (DFLAW) facilities at the Waste Treatment Plant include a new Analytical Laboratory, the new […]

  • SRR Wins 98% of Available Fee for Savannah River Liquid Waste Work

    Amentum-led Savannah River Remediation, the liquid waste contractor at the Department of Energy’s Savannah River Site in South Carolina, took home almost $64 million or 98% of its total potential fee for work done over an 18-month period ending Sept. 30, 2020. The contractor was rated “very good” on its subjective fee as determined by […]

  • DOE Pulls Plug on $13B Hanford Tank Closure Contract Award

    Just before Christmas, and months after two losing teams protested the award, the Department of Energy canned a $13-billion liquid-waste cleanup contract awarded in May to a BWX Technologies-led team. In a Dec. 23 memo to Hanford employees, DOE said it scrapped the Tank Closure Contract because it wants to combine that work — emptying […]

  • Atkins-led Team Fails to Win Attorney Fees in GAO Case

    The Government Accountability Office says Hanford Tank Closure Co., made up of Atkins, Amentum and Westinghouse Government Services, is not entitled reimbursement of its legal costs for protesting a $13-billion tank closure contract issued in May by the Department of Energy. In a November decision published this month, the Government Accountability Office (GAO) said the […]

  • Procurement Practically Seamless During Pandemic for EM

    While the coronavirus pandemic affected nuclear cleanup at the Department of Energy in ways great and small, it did not slow down the acquisition process in 2020, when the Environmental Management Office awarded about $31 billion worth of new cleanup contracts. That includes $17 billion of contracts during the 2020 calendar year and some $14 […]

  • Wrap Up: Carlsbad Tech Bid Deadline Extended Until Dec. 23

    The Department of Energy extended the bid deadline for a new Carlsbad Technical Assistance Contract by one week, to Dec. 23. The DOE Office of Environmental Management announced the extra time in a package of questions and answers published Dec. 11 on a procurement website. Previously, bids were due Dec. 14. In a final Q&A […]

  • Hanford System Plan 9 Suggests Cleanup Likely to Cost More, Take Longer

    Cleaning up the former plutonium production complex at the Hanford Site in Washington state could be even more costly and take longer than expected, a Department of Energy official said Wednesday during a virtual meeting. The forecast is from DOE’s ninth and latest revision of the River Protection Project System Plan. Brian Harkins, the agency’s […]

  • Hanford System Plan 9 Suggests Cleanup Likely to Cost More, Take Longer

    Cleaning up the former plutonium production complex at the Hanford Site in Washington state could be even more costly and take longer than expected, a Department of Energy official said Wednesday during a virtual meeting. The forecast is from DOE’s ninth and latest revision of the River Protection Project System Plan. Brian Harkins, the agency’s […]

  • ECA Panel Predicts Lame Duck Session Won’t Be Dull

    There is a decent chance, perhaps 50/50, of the lame duck session of Congress reaching a deal on a major omnibus appropriations package for fiscal 2021, a Department of Energy-savvy panel of Washington watchers said Thursday. Both House Speaker Nancy Pelosi (D-Calif.) and Senate Majority Leader Mitch McConnell (R-Ky.), hope to pass a 2021 spending […]

  • More Details on Potential Y-12, Pantex Bidders Come to Light

    The National Nuclear Security Administration still had not at deadline released the final solicitation for the potentially $28-billion, $10-year contract to manage its two big nuclear-weapons production sites, but more information is percolating up through industry about the players interested in the deal. With the envisioned start of the transition from the Bechtel-led incumbent, Consolidated […]

  • Hanford Site Boss Stresses Ethical Standards

    The Department of Energy’s Hanford Site in Washington state can use education along with the specter of financial loss in pushing ethical standards for contractors, the site’s local fed said recently.  The DOE has mandated ethics programs for major contractors and this effort is “very similar to a safety program” in that it’s designed to […]

  • Savannah River Liquid Waste Boss Discusses New Hires, 2020 Developments

    The liquid waste contractor at the Department of Energy’s Savannah River Site in South Carolina hired 151 new employees with an average age of 37 during fiscal 2020. As a result, the average age of the 2,600-person workforce at Amentum-led Savannah River Remediation (SRR) is 48-years old, Phil Breidenbach, president & project manager of the […]

  • Savannah River Liquid Waste Boss Discusses Staffing, 2020 Developments

    The liquid waste contractor at the Department of Energy’s Savannah River Site in South Carolina hired 151 new employees with an average age of 37 during fiscal 2020. As a result, the average age of the 2,600-person workforce at Amentum-led Savannah River Remediation (SRR) is 48-years old, Phil Breidenbach, president & project manager of the […]

  • Navarro-Led Team Lands $389M Hanford Laboratory Contract

    The Department of Energy Tuesday awarded a joint venture led by Oak Ridge, Tenn.-based Navarro Research and Engineering a $389-million contract to run the 222-S Laboratory at the Hanford Site in Washington state. Hanford Laboratory Management and Integration is a team of Navarro and Advanced Technologies and Laboratories International, a wholly owned subsidiary of Planned […]

  • DOE Unveils Potential 15-Year, $21B RFP for Savannah River Liquid Waste Contract

    The potential $21-billion Department of Energy solicitation for liquid waste management and related environmental work at the Savannah River Site in South Carolina is on the street. In a notice posted Thursday on a procurement website, the DOE Office of Environmental Management issued the final request for proposals (RFP) for what it calls the Savannah […]

  • Teaming Arrangements Taking Shape for Y-12, Pantex Contract Recompete

    The competitive landscape for the potentially 10-year, $28-billion contract to manage the National Nuclear Security Administration’s two big nuclear weapons production sites is starting to come into focus, now that the agency has hosted hopefuls for site visits and one-on-one meetings. Following tours of the Y-12 National Security Complex in Oak Ridge, Tenn., and the […]

  • Teaming Arrangements Taking Shape for Y-12, Pantex Contract Recompete

    The competitive landscape for the potentially 10-year, $28-billion contract to manage the National Nuclear Security Administration’s two big nuclear weapons production sites is starting to come into focus, now that the agency has hosted hopefuls for site visits and one-on-one meetings. Following tours of the Y-12 National Security Complex in Oak Ridge, Tenn., and the […]

  • Hanford Contractors Paying Nearly $58M to Resolve Overbilling Case

    Two Department of Energy contractors, Bechtel and what is now Amentum, will pay $57.75-million to resolve claims that a joint venture overbilled the government for work at the Hanford Site in Washington, the Department of Justice said late Tuesday. Bechtel and Amentum, the former AECOM Energy & Construction, admit no wrongdoing by their subsidiary Waste […]

  • COVID-19 Has Feds Seeking Delay on Some Hanford Tasks

    The Department of Energy wants to delay some tank-related nuclear weapons cleanup work at the Hanford Site because of the ongoing COVID-19 pandemic, attendees said this week during an online meeting of the Hanford Advisory Board. Dealing with the novel coronavirus delayed some projects at the former plutonium production site, the Department of Justice said […]

  • Bechtel, Amentum Predecessor to Pay About $58M to Resolve Fraud Claims at Hanford

    Two Department of Energy contractors, Bechtel and Amentum predecessor AECOM, will pay $57.75-million to resolve claims that a joint venture overbilled the government for work at the Hanford Site in Washington, the Department of Justice said late Tuesday. Bechtel and Amentum, the former AECOM Energy & Construction, admit no wrongdoing by their subsidiary Waste Treatment […]

  • Energy Department IG Faults Two Hanford Contractors on Respirator Upkeep

    The Department of Energy’s Office of Inspector General says two major contractors at the Hanford Site in Washington State don’t always maintain respirators in accordance with government requirements. The report said more attention to respiratory equipment is needed by Jacobs subsidiary, CH2M HILL Plateau Remediation Co., and Amentum-led Washington River Protection Solutions. CH2M is responsible […]

  • Oak Ridge Contract Briefing Sparks Huge Virtual Turnout

    Documents published this week show more than 150 individuals and 60 organizations registered to take part in online briefings on the planned megabuck remediation deal at the Energy Department’s Oak Ridge Site in Tennessee. The list of firms posted Monday that turned out to kick the tires and learn more about the potentially 10-year, $8.3 […]

  • Transition to Hanford Central Plateau Contractor Starts Oct. 5

    Starting Oct. 5, a new Amentum-led team will begin a 60-day transition to take over as prime contractor for the mostly solid-waste cleanup of the Hanford Site’s central plateau, the Department of Energy said Tuesday. Central Plateau Cleanup Co., comprised of Amentum, Fluor, and Atkins, won the potentially 10-year, $10 billion contract in December. A […]