May 30, 2025

BPA backs nuclear power uprate for Columbia Generating Station

By ExchangeMonitor
The Bonneville Power Administration has approved Energy Northwest’s plans to increase the nuclear energy output at its Columbia Generating Station in Richland, Wash. by 186 megawatts by 2031. The extended power uprate project is estimated to cost $700 million…
Thank you for visiting
RadWaste Monitor!

You must be logged in as a subscriber to view this page.

Not a subscriber? Click here to sign up for a FREE six-week trial and receive access to this article, along with our entire archives.

LOGIN

Please contact [email protected] if you are unable to login.

RadWaste & Materials Monitor
RadWaste & Materials Monitor provides news and intelligence on radioactive waste management, including information on commercial and federal LLRW disposal, storage and treatment, decommissioning and decontamination, rad material recycling, and more...
Subscribe
Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More