After months of preparation, the Department of Energy’s Office of Environmental Management said on Tuesday before Thanksgiving that it is geared up to restart uranium recovery at H Canyon at the Savannah River Site (SRS) in South Carolina.
Although the Nov. 24 announcement did not give a specific date for restart, DOE called this a big step in enabling SRS to provide high-assay low-enriched uranium (HALEU) for advanced nuclear reactors.
Following a February department decision, SRS will extract uranium from spent fuel held underwater at the Savannah River L-Basin. The plan is for DOE to eventually produce up to 22.8 metric tons of HALEU, which could be used as domestic fuel stock for advanced nuclear units, including small modular reactors.
The 1950s-vintage H Canyon is the nation’s only nuclear chemical separation facility. H-Canyon is also the nation’s only facility capable of producing HALEU on a big scale.
“During this fiscal year, which began Oct. 1, the H Canyon team is preparing to begin first-cycle operations,” DOE said. “First-cycle restart requires the reactivation of hundreds of operations and maintenance procedures, implementation of several complex design changes and completion of numerous maintenance activities.”
Also Tuesday, DOE announced it is returning to service a big uranium storage unit at H-Canyon.
This move has been in the works since the early months of President Donald Trump’s second term. In May 2025, Trump issued an executive order on reviving the domestic nuclear industrial base.
HALEU is enriched to between 5% and 20%, allowing smaller reactor cores to run longer. Low-enriched uranium, used by the current domestic fleet, is enriched to no more than 5%, according to DOE.
